Wednesday, October 21, 2026

Don't Miss

NEURC Expands Tertiary Regulation Auctions Across All of Ukraine

Ukraine's NEURC has expanded the tertiary regulation market from the Kyiv region to the entire country, allowing generation assets in any region to participate in transmission system operator auctions.

Latest News

NEURC Expands Tertiary Regulation Auctions Across All of Ukraine

Ukraine's NEURC has expanded the tertiary regulation market from the Kyiv region to the entire country, allowing generation assets in any region to participate in transmission system operator auctions.

Taiwan: 1 GW Hai Long Offshore Wind Farm Fully Installed

All 73 turbines at Taiwan's 1,022 MW Hai Long offshore wind farm have been installed and connected to the grid. Full commercial operations are expected in 2027.

Energy for Your Home

Technology & Discoveries

NEURC Expands Tertiary Regulation Auctions Across All of Ukraine

Ukraine's NEURC has expanded the tertiary regulation market from the Kyiv region to the entire country, allowing generation assets in any region to participate in transmission system operator auctions.

Modern Solutions

Fresh Publications

NEURC Expands Tertiary Regulation Auctions Across All of Ukraine

Ukraine's NEURC has expanded the tertiary regulation market from the Kyiv region to the entire country, allowing generation assets in any region to participate in transmission system operator auctions.

Useful Tips

NEURC Expands Tertiary Regulation Auctions Across All of Ukraine

Ukraine's NEURC has expanded the tertiary regulation market from the Kyiv region to the entire country, allowing generation assets in any region to participate in transmission system operator auctions.

Taiwan: 1 GW Hai Long Offshore Wind Farm Fully Installed

All 73 turbines at Taiwan's 1,022 MW Hai Long offshore wind farm have been installed and connected to the grid. Full commercial operations are expected in 2027.

ALP20 Coating Cuts Lightning Damage to Wind Turbine Blades

Arctura has reported ALP20 field results: 35 lightning strikes across 15 coated turbines — zero blade damage recorded.

France to Ease Grid Connection Rules for Solar-Plus-Storage Up to 25 MW

France will ease grid connection rules for solar-plus-storage projects up to 25 MW by end-2026, maintaining a 17 MW cap on maximum grid injection.

Hybrid, Grid-Tied, or Off-Grid Inverter: Which to Choose in 2026

Savolture's guide explains why hybrid inverters are displacing grid-tied systems in the US: 5–10 kW price ranges, the NEM 3.0 reform, and battery storage payback in 5–7 years.

Worth Reading

Ukraine's NEURC has expanded the tertiary regulation market from the Kyiv region to the entire country, allowing generation assets in any region to participate in transmission system operator auctions.

Ideas & Projects

Good to Know

Energy Worldwide

Latest Articles

Most Popular

Recent Comments